Platform demonstration cases (simulated)
Data centre demo: 400 kW IT load, air to liquid cooling
8,760-hour simulation comparing an all-air baseline with a D2C liquid-cooling architecture, quantifying PUE and cooling energy.
- Data centre
- IT 400 kW
Scope
- All-air baseline vs liquid-cooling annual simulation
- D2C cold plate, CDU, dry cooler and free-cooling comparison
Deliverables
- PUE / pPUE analysis report
- Cooling architecture comparison and sensitivity