Projects
Projects
Each card lists the project type, scale, what we did and what we delivered. No guaranteed savings figures; every number comes with its conditions.
Platform demonstration cases (simulated)
The following are demonstration results from annual simulations on AirFuture's AirCore engine. They are not measured guarantees; actual results depend on site conditions.

Energy simulationDemo (simulated)
Ice storage demo: 180 RT mall, annual simulation
It saves money, not energy. Annual simulation on our AirCore engine compares ice-storage dispatch strategies priced with Taipower three-tier tariffs.
180 RT
View case 
Data centreDemo (simulated)
Data centre demo: 400 kW IT load, air to liquid cooling
8,760-hour simulation comparing an all-air baseline with a D2C liquid-cooling architecture, quantifying PUE and cooling energy.
IT 400 kW
View case 
CAASDemo (simulated)
CAAS prototype demo: AI control vs conventional automation
CAAS prototype model comparing AI-optimised control against conventional automatic control over a full year.
Hsinchu (weather file) 280 RT average
View case