Plant operation optimisation
No equipment replacement needed: adjusting operating setpoints alone is achievable savings. Every saving has a cost. A model without cost terms pushes setpoints to the limit and produces impressive but unachievable percentages.
- Design-day demonstration: pumps −27.9%, towers −22.4%, plant total −5.9% (simulated)
- Supported systems: primary-only, primary-secondary, common-pipe, ice storage, heat recovery, VRF, data-centre air and liquid cooling
- Keep your BMS: connect via Modbus / BACnet and run optimisation as a background subsystem (points list and database required)